Open a schedule
- In Primavera P6, open the layout with WBS grouping and the columns Activity ID, Activity Name, Original Duration, Remaining Duration, Start, Finish, Actual Start, Actual Finish, Schedule % Complete, Physical % Complete, Total Float.
- Click in the activity table, press Ctrl+A then Ctrl+C.
- In Excel, click cell A1 of a blank sheet, press Ctrl+V, and save as .xlsx.
- Open that file here (or drag it onto this window).
- Or open a P6 .xer export directly for the full data (WBS, logic, codes, UDFs, resources, baseline).
- Or open a Microsoft Project .xml file (in Project: File > Save As > XML Format) for the full data: outline WBS, logic and lags, constraints, calendars, resources, baseline and custom fields. A binary .mpp is recognised and XERly shows how to save it as XML. File > Export to P6 XER writes a .xer copy for Primavera P6.